The schedule says two months, but a month into implementation the customer asks to change requirements for a core screen.
The code already written has to be reworked, and the test plan has to be rebuilt from the beginning.
Information system construction management is the set of activities that reduce this kind of problem in advance by managing
planning, methods, configuration, quality, and testing
together.
This post covers what each area of management checks, and how tests should be paired with development stages.
Construction management checks whether a project is finishing as planned from several angles.
Each area asks a different question, so focusing on only one area lets problems surface in another.
Area
Question it checks
Example
Schedule management
Do the completion dates of each stage match the plan
Configuration management is the activity of controlling the
versions and change history
of deliverables.
When the deliverables at a particular point are fixed as a
baseline
, later changes must go through an approved procedure before they are applied.
๐
Without configuration management, copies of the same file scatter, and nobody can be sure which one is the latest.
Define the flow of change request, review, approval, and application, and manage every deliverable in one place.
The V model places the development stages on the left and the matching test stages on the right.
The left side is the
building process
, going down from requirements to implementation. The right side is the
verification process
, going up from implementation to acceptance testing.
Requirements analysis, system design, detailed design, and implementation descend on the left, while unit, integration, system, and acceptance tests ascend on the right, with matching levels paired as a V model
Pairing the stages means that when you define requirements, you also define the criteria that acceptance tests will use.
For example, a requirement that "payment approval finishes within two seconds" must already be written as a criterion that acceptance testing can measure.
Boundary value testing checks the values around a criterion on both sides, such as "is a pass mark of 60 or higher."
It is easier to understand alongside the Verification and Validation post.
Information system construction management is the work of
managing schedule, cost, quality, and risk as one flow
.
Choose the method according to how firmly the requirements are fixed, and use configuration management to set baselines and keep deliverables under control.
If tests are planned to match development stages, as in the V model, problems are found earlier and late surprises become less likely.